| Adelaide Desalination plant |
|
Two large acoustic enclosures were designed and built at our premises for the Adelaide desalination project. These enclosures housed a 1100KVa generator set, 2400Lt diesel fuel tank and a rear mounted electrical CB. The enclosure was an impressive 9.5m long x 3.0m wide x 3.2m high which travelled as one complete assembly as a single lift enclosure. A two pack paint system ensured durability for the future. The contract was won on the prevision of an extremely early delivery which dB Acoustics were able to achieve.
|