You are here: Home > Showcase > Case Studies > Midfield Co-Generation
Midfield Co-Generation

Midfield installationdB Acoustics Pty Ltd manufactured and packaged a 1.5MW Co-Generation package which included an acoustic canopy rated to reduce noise level to 85dB(A)@1 meter along with integral mono rail lifting frame and control room.

The package scope also included the full design and installation of the Cooling Water, Gas and Oil system. An Auxiliary skid contained new and waste oil tanks plumbed direct to engine oil system. Heat exchanges and associated equipment completed the full cooling water package as was full tested at our premises before delivery to site which eliminated any on site commissioning problems.

The enclosure and skid package was connected via a steel walkway to allow easy and safe access to all servicing components.